Briefs in Egypt often arrive late: a date moves, a sponsor confirms in the final week, or a supplier drops out. The question is not whether it is ideal. It is what can still be done properly. Here is what MRICS has delivered under 48-hour deadlines, and what made it possible.
A full world-championship hall in 48 hours
For the 37th Speedball World Championship in Cairo, the Ministry of Youth and Sports needed the event production and trophies in 48 hours. We produced the hall layout and drawings, 24 branded court separators, a 6 ร 3 m medal-stage backdrop, a podcast backdrop, delegation signs, trophies and the event reel.
A complete exhibition booth in 48 hours
Stone Africaโs brief reached us two days before the expo installation. We designed, produced (including CNC-cut decorative panels) and installed the booth in time.
A medical-congress stand in two days
When Edwards Lifesciencesโ event date moved at the last minute, the approved 3D model and CAD drawings let our workshop start immediately and deliver the 6 ร 3 m stand in two days.
What makes 48 hours possible
- In-house production. Design, carpentry, printing and finishing under one roof, so nothing waits on a third party.
- Parallel work. Drawings, print files and fabrication run at the same time, not one after another.
- Fast decisions. One decision-maker on the client side who can approve within hours.
- Simple, strong design. Fewer custom pieces, more impact per element.
What 48 hours does not allow
Complex custom structures, imported materials, or many rounds of revisions. A good partner will tell you honestly what fits the time and what does not.
Got a late brief? MRICS designs, produces and installs from Cairo. Send it now, and we will tell you within hours what we can deliver.